Concrete Calculator — Cubic Yards, Bags & Slab Cost

By the Linear Feet Calculator Team | Reviewed by concrete and flatwork contractors | Updated June 2026

Concrete is sold by the cubic yard, but you measure your project in feet and inches. This calculator bridges that gap — enter your slab dimensions and get cubic yards, cubic feet, bag equivalents, and a delivered cost estimate with a waste allowance built in.

Pouring a footing, curb, or narrow strip instead? See our Linear Feet for Concrete calculator for length-based pours.

Concrete Slab Calculator

Enter your slab dimensions. Results show volume in cubic yards and cubic feet, bag counts, and estimated ready-mix cost.

Advertisement

The Concrete Volume Formula

Every concrete quantity calculation reduces to one formula. The only trick is that thickness is given in inches while length and width are in feet, and the answer is sold in cubic yards.

Cubic Yards = (Length ft × Width ft × Thickness in ÷ 12) ÷ 27

The division by 12 converts inches of thickness into feet. The division by 27 converts cubic feet into cubic yards, because a cubic yard is 3 ft × 3 ft × 3 ft = 27 cubic feet. Ready-mix trucks, dispatchers, and quotes all speak in cubic yards, so that final conversion is the one that matters when you place an order.

Worked example: A 24 × 24 ft garage floor at 4 inches. 24 × 24 = 576 sq ft. 4 in ÷ 12 = 0.333 ft. 576 × 0.333 = 192 cubic feet. 192 ÷ 27 = 7.11 cubic yards. With a 10% waste allowance, order 7.8 cubic yards — which in practice means asking for 8 yards.

Concrete Volume by Common Slab Size

These figures are exact volume with no waste allowance. Add 10% before ordering. Bag counts assume 80 lb bags at 0.60 cubic feet each.

Slab Size Sq Ft 4 in (cu yd) 6 in (cu yd) 80 lb Bags (4 in) Typical Use
4 × 4 ft160.200.309AC pad, landing
8 × 10 ft800.991.4845Small shed floor
10 × 10 ft1001.231.8556Patio, hot tub pad
12 × 12 ft1441.782.6780Patio, single-car pad
12 × 20 ft2402.964.44133Single-car driveway
16 × 16 ft2563.164.74142Large patio
20 × 20 ft4004.947.41222Two-car garage floor
24 × 24 ft5767.1110.67320Standard 2-car garage
20 × 40 ft8009.8814.81444RV pad, long driveway
30 × 40 ft1,20014.8122.22667Shop / barn floor

Above roughly 1 cubic yard, ready-mix delivery is cheaper and far less labor than mixing bags. Below 1 cubic yard, bags usually win because short-load fees dominate the price of a small ready-mix order.

Bags of Concrete Per Cubic Yard

A cubic yard is 27 cubic feet. Divide 27 by the yield of your bag size to get bags per yard. Yield varies slightly by manufacturer, so treat these as planning numbers and buy a couple of spare bags.

Bag Size Yield (cu ft) Bags per Cu Yd Water Needed Cost per Cu Yd
80 lb0.6045~6 pt/bag$290–$400
60 lb0.4560~4.5 pt/bag$300–$420
50 lb0.37572~3.5 pt/bag$320–$450
Ready-Mix Truck——Batched at plant$160–$195

Ready-mix is 2–3x cheaper per cubic yard than bagged concrete, but carries a short-load fee of $60–$120 on orders under 4–5 yards. The crossover point where ready-mix becomes cheaper is typically around 1–1.5 cubic yards.

Concrete Slab Cost — Material vs Installed

Material cost is only part of a slab. Forms, base prep, reinforcement, finishing, and control joints usually cost more than the concrete itself on residential jobs.

Cost Component Cost per Sq Ft Cost on 20×20 Slab Notes
Concrete material (4 in)$1.98–$2.41$790–$963Ready-mix at $160–$195/cu yd
Gravel base (4 in)$0.60–$1.20$240–$480Compacted crushed stone
Forms & stakes$0.50–$1.10$200–$440Lumber, often reusable
Rebar or wire mesh$0.15–$0.60$60–$240#3/#4 grid or 6×6 WWM
Labor (place & finish)$3.00–$7.00$1,200–$2,800Crew, screed, float, trowel
Short-load fee—$60–$120Under 4–5 cu yd orders
Total installed (4 in)$6.50–$10.50$2,600–$4,200Plain broom finish
Total installed (stamped)$10–$20$4,000–$8,000Decorative pattern & color

Sources: ready-mix and installed slab pricing from ConcreteNetwork.com (updated July 2026), which compiles NRMCA national data and supplier quotes. Component line items (base, forms, rebar, labor) are planning estimates, not sourced figures. Metro markets on the coasts run 20–40% above these ranges; rural inland markets often fall 10–20% below. Always get three local quotes before budgeting.

How Thick Should the Slab Be?

Thickness drives both volume and cost. Going from 4 to 6 inches adds 50% to your concrete order, so match thickness to the actual load rather than over-building by default.

Application Thickness PSI Mix Reinforcement Cu Yd per 100 Sq Ft
Sidewalk / garden path3–4 in3,000Fiber mesh or none0.93–1.23
Patio4 in3,000–3,5006×6 wire mesh1.23
Shed / garage floor4 in3,500Wire mesh or #3 rebar1.23
Driveway (cars)4–5 in3,500–4,000#3 rebar 18 in grid1.23–1.54
Driveway (trucks / RV)6 in4,000#4 rebar 12–18 in grid1.85
Shop / heavy equipment6–8 in4,000–4,500#4/#5 rebar, both mats1.85–2.47

Going from 4 to 5 or 6 inches increases a slab’s load-carrying capacity by nearly 50% according to ConcreteNetwork, so the extra depth pays for itself anywhere vehicles will park or turn. Note that thickened edges add volume beyond the flat slab calculation: a 12-inch-deep, 12-inch-wide perimeter footing on a 20 × 20 slab adds roughly 0.9 cubic yards on top of the 4.94 yard slab figure.

Common Concrete Estimating Mistakes

Forgetting to Divide Thickness by 12

Plugging 4 into the formula instead of 0.333 gives you a number 12 times too large. A 20 × 30 slab at 4 inches is 7.4 cubic yards, not 88.9. If your answer looks absurdly large, this is almost always the reason. Thickness must be converted from inches to feet before multiplying.

Ordering Exact Volume With No Waste Allowance

Subgrade is never perfectly flat, forms bow slightly under load, and some concrete is lost in the chute and wheelbarrow. Ordering exactly 7.11 yards for a 7.11 yard slab means running short. A second truck triggers a fresh short-load fee of $60–$120 and creates a cold joint where the two pours meet — a permanent weak line in the slab.

Ignoring Thickened Edges and Footings

Many slabs are not uniform thickness. Garage slabs and shed pads often have a 12-inch-deep perimeter footing, and driveways frequently have thickened edges where vehicles turn. These add real volume that the flat length × width × thickness formula misses entirely. Calculate the perimeter footing separately as its own linear-feet-times-cross-section volume and add it to the slab total.

Mixing Bags for Pours Over One Cubic Yard

One cubic yard is 45 eighty-pound bags — roughly 3,600 lbs of material to haul, open, and mix. Beyond about one yard the labor becomes punishing and the concrete quality suffers because you cannot place and finish it as a single monolithic pour. Batches mixed minutes apart begin setting at different times, producing cold joints and inconsistent surface finish across the slab.

About these price ranges

Pricing varies widely by region, season, project size, and site conditions. Treat every figure on this page as a planning estimate for budgeting only — not as a quote. Coastal metro markets commonly run 20–40% above national ranges while rural inland markets can fall 10–20% below. Always collect at least three written quotes from local contractors before committing to a budget.

Sourced figures: ConcreteNetwork.com concrete prices (compiles NRMCA national data, updated July 2026).

Unsourced estimates: Base gravel, forms, rebar, and labor line items. These are informed planning figures rather than data drawn from a published price index, and they carry a correspondingly wider margin of error.

Frequently Asked Questions

How much concrete do I need for a 10x10 slab?
A 10×10 ft slab at 4 inches thick needs 1.23 cubic yards of concrete. The math: 10 × 10 × (4/12) = 33.33 cubic feet, divided by 27 = 1.23 cubic yards. Order 1.4 cubic yards to include a 10% waste allowance. In 80 lb bags, that is 56 bags at 0.60 cubic feet per bag. At 6 inches thick the same slab needs 1.85 cubic yards.
How many bags of concrete are in a cubic yard?
One cubic yard equals 27 cubic feet. An 80 lb bag yields about 0.60 cubic feet, so you need 45 bags per cubic yard. A 60 lb bag yields about 0.45 cubic feet — 60 bags per yard. A 50 lb bag yields about 0.375 cubic feet — 72 bags per yard. Bagged concrete costs roughly 3–4x more per yard than ready-mix, so bags only make sense under about 1 cubic yard.
How much does a yard of concrete cost?
Ready-mix concrete runs $160–$195 per cubic yard in most US markets, with a 2025 national average of $179.95 per cubic yard according to NRMCA data. Add $60–$120 for a short-load fee if you order under 4–5 yards, plus wait-time charges beyond the free unload window. Delivered and poured by a contractor, expect $6.50–$10.50 per square foot for a plain 4-inch slab including labor, forms, and finishing.
How do I calculate concrete for a slab in cubic yards?
Multiply length in feet × width in feet × thickness in feet, then divide by 27. Convert thickness from inches to feet by dividing by 12 — so 4 inches is 0.333 ft and 6 inches is 0.5 ft. Example: a 20 × 30 ft slab at 4 inches equals 20 × 30 × 0.333 = 200 cubic feet, divided by 27 = 7.4 cubic yards. Always add 5–10% for spillage, uneven subgrade, and over-excavation.
Should I order 4 inch or 6 inch thick concrete?
Use 4 inches for patios, walkways, shed floors, and residential garage floors carrying passenger vehicles. Use 5–6 inches for driveways with occasional truck traffic, RV pads, and workshop floors with heavy equipment. Use 6 inches with rebar for anything carrying a loaded pickup, trailer, or dumpster. Going from 4 to 6 inches increases material volume by 50%, so it is a meaningful cost decision.
How much extra concrete should I order for waste?
ConcreteNetwork advises planning to order 10% to 15% more than the computed volume to allow for spillage and an uneven subgrade. Use the lower end for a slab on a well-prepared level gravel base, and the upper end if the subgrade is rough, if you are pouring on soil without a compacted base, or if the pour includes footings and thickened edges. Running short mid-pour is far more expensive than a small overage — a second truck triggers a new short-load fee and creates a cold joint in the slab.